Mulilo Renewable Energy (South Africa)
![]() |
De Aar Grid Connected 100.5 MW Wind Farm, South Africa
The project will be developed by Mulilo Renewable Energy. The project objective is to supply clean electricity to the grid of the Republic of South Africa.
The project envisages construction and operation of a wind farm with the installed capacity of 100.5 MW. The wind energy facilities will consist of 67 wind turbine generators, 1.5 MW each. Produced electricity will be supplied to the Eskom electricity network.
The total expected emission reductions at the end of the 10-year crediting period - 2,190,200 t CO2.
Namaqualand Grid Connected 49.5 MW Wind Farm, South Africa
The project will be developed by Mulilo Renewable Energy. The project objective is to supply clean electricity to the grid of the Republic of South Africa.
The project envisages construction and operation of a wind farm with the installed capacity of 49.5 MW. The wind energy facilities will consist of 33 wind turbine generators, 1.5 MW each. Produced electricity will be supplied to the Eskom electricity network.
The total expected emission reductions at the end of the 10-year crediting period - 1,322,000 t CO2.
Springbok Grid Connected 55.5 MW Wind Farm, South Africa
The project will be developed by Mulilo Renewable Energy. The project objective is to supply clean electricity to the grid of the Republic of South Africa.
The project envisages construction and operation of a wind farm with the installed capacity of 55.5 MW. The wind energy facilities will consist of 37 wind turbine generators, 1.5 MW each. Produced electricity will be supplied to the Eskom electricity network.
The total expected emission reductions at the end of the 10-year crediting period - 1,314,000 t CO2
Neusberg Grid Connected 10 MW Hydroelectric Power Plant, South Africa
The project will be developed by Mulilo Renewable Energy. The project objective is to supply clean electricity to the grid of the Republic of South Africa.
The project envisages construction and operation of a small run-of-the-river hydroelectric power plant on the Orange River with the installed capacity of 10 MW. Produced electricity will be supplied either to the Eskom electricity network or to alternative buyers looking to purchase green power. The proposed project is considered as a base load power station.
The total expected emission reductions at the end of the 10-year crediting period - 437,340 tCO2
Prieska Grid Connected 20 MW Solar Park, South Africa
The project will be developed by Mulilo Renewable Energy. The project objective is to supply clean electricity to the grid of the Republic of South Africa.
The project envisages construction and operation of a solar park with the installed capacity of 20 MW. The solar park will be equipped with several arrays of photovoltaic (PV) panels. Produced electricity will be supplied to the Eskom electricity network.
The total expected emission reductions at the end of the 10-year crediting period - 392,000 t CO2
De Aar Grid Connected 10 MW Solar Park, South Africa
The project will be developed by Mulilo Renewable Energy. The project objective is to supply clean electricity to the grid of the Republic of South Africa.
The project envisages construction and operation of a solar park with the installed capacity of 10 MW. The solar park will be equipped with several arrays of photovoltaic (PV) panels. Produced electricity will be supplied to the Eskom electricity network via the Hydra Substation situated near De Aar.
The total expected emission reductions at the end of the 10-year crediting period - 196,000 t CO2