Wood Waste to Energy in Severoonezhsk, Arkhangelsk Region, Russian Federation
![]() |
23MW Biofuel Boiler House in Severoonezhsk |
The project is structured around construction of a biofuel boiler house with the installed capacity of 20 Gcal/h (23.26 MW) for heat supply of Severoonezhsk settlement, the Plesetsk District, the Arkhangelsk Region. The main fuel of the boiler house is wood waste (chips, sawdust and long sawmill residues) from the local sawmills. The boiler house was put into operation in 2008. The project is implemented with the participation of OJSC "Mezhregionenergogas" and CJSC "Teplo-Invest".
The project implementation will result in utilization of significant amount of wood waste from the local sawmills with the proportional reduction of wood waste disposal to the dumps; lower consumption of residual fuel oil in the old boiler house owned by OJSC "Severoonezhsk Bauxite Mine"; significant reduction of heat losses during its delivery to end-users (the old boiler house is 7 km away from the settlement); and mitigation of negative environmental impacts.
The greenhouse gas emission reductions are achieved due to reduction of residual fuel oil combustion and methane emissions from anaerobic decay of wood waste at the dumps.
Expected emission reductions over 2008-2012 – 130 kt ÑÎ2e
Project status
|
Validated
|
15.02.2010
|
BVC
|
|
Approved
|
30.12.2010
|
Order of the Russian Ministry of
Economic Development No.709 dated December 30, 2010 |
|
Registered
|
|
ITL ID RU1000270
|
|
Verified emission reductions
over 2008-2010 |
04.06.2011
|
54 340 tonnes of ÑÎ2e
|
|
ERUs issued for 2008-2009
|
04.08.2011
|
27 080 ERUs
|